Client

Shaftesbury CL Ltd

Location

Covent Garden

Contractor

KPM Construction Ltd

Contract sum

£830,000

Onsite duration

34 Weeks

Considerate Constructors Scheme Score

35/50

BREEAM rating

Very Good

Description

The site consisted of offices on the upper floors of 44 Wellington Street and adjoining 3 Russell Street. Also included within the works were the external repairs and decorations. This development is on BREEAM’s website as a case study https://www.breeam.com/case-studies/residential/44-wellington-street-35-catherine-street/

Client brief

The brief was to convert these upper parts in to three one bedroom apartments. Plus the first floor conversion of 35 Catherine Street into a two bedroom apartment.

Our role

To prepare drawings for change of use at planning. We were appointed as the Principal Designer and prepared the tender package as well as project manager/contract administrator.